Sarajevo International Airport Office Building

Upon request by the client, Studio NONSTOP LLC, we were tasked with carrying out an analysis of submitted BIM model of the Sarajevo Airport administrative building. The analysis outlined the quality and level of implementation of BIM and correct use of Autodesk Revit software.

After the analysis, the revision started and it included the architectural phase with all the construction elements, MEP to LOD300.

Model elements are graphically displayed within the model as a specific system, object or set in terms of quantity, size, shape, location and orientation. Non-graphic information is also assigned to the model elements.

An important segment in this project is management of information within the model and possibility of manipulation as well as technical documentation development.

Location
Bosnia and Herzegovina
Client
Studio NONSTOP d.o.o.
Size
4.000 m²
Scope
Revision of BIM model

Share